Address
Building A1, Runteng Industrial Park, No. 4 Xishan Road, Longteng Community, Shiyan Subdistrict, Bao'an District, Shenzhen 518000, China
Work Hours
Monday to Saturday: 09:00 – 23:00 (UTC+8)
Sunday: closed
Address
Building A1, Runteng Industrial Park, No. 4 Xishan Road, Longteng Community, Shiyan Subdistrict, Bao'an District, Shenzhen 518000, China
Work Hours
Monday to Saturday: 09:00 – 23:00 (UTC+8)
Sunday: closed
Two Yamaha YSM20R and YSM10 high-speed SMT lines rated up to 95,000 CPH for a Changsha PCB assembly OEM: 99.5% yield, 40% faster cycles and SPI-verified printing.

See how a Changsha PCB assembly OEM scaled to high-speed SMT production with Yamaha YSM20R and YSM10 mounters from JHIMS — two orders since 2022, YSM20R lines rated up to 95,000 CPH, 40% faster cycles and 99.5% yield.
At a glance: who the customer is, where the machines were delivered, and what drove the investment.
Contract assembly for automotive and consumer electronics needs speed and measurable process control. Over 70% of global OEMs require SMT throughput above 50,000 CPH, so a Changsha PCBA maker built two lines to match.
An OEM in Changsha scaling complex automotive and consumer electronics PCBA orders needed to automate and hit industry benchmarks: more than 70% of global OEMs now require SMT throughput above 50,000 CPH.
December 2022: a Yamaha YSM20 and YSM10 with a JHIMS S630 3D SPI and 60 tape feeders, the first automated line. November 2023: two YSM20R and two YSM10 forming two lines rated up to 95,000 CPH each.


A line rated 95,000 CPH can still miss that rate. Component mix (QFN, BGA, SOP, tray parts), bottleneck station, changeover time and repeatability are the four pressures a split into two machine roles answers.
The reported pressures on the line, their engineering cause, and the part of the configuration that answers each.
| Reported pressure | Engineering cause | How the configuration answers it |
|---|---|---|
| 95,000 CPH throughput target | Output is set by the slowest station, not by the fastest machine | Batch work split between high-speed and multifunction mounters |
| Component diversity | QFN, BGA, SOP and tray parts cannot be placed at chip-component beat rates | YSM10 handles larger packages and tray components; YSM20R keeps the high rate |
| Bottleneck risk | A queue forms at the limiting station and becomes a delivery delay | Line sized so the fast machine is not waiting on the varied work |
| Consistency at scale | High-mix changeovers interrupt rhythm and repeatability | Up to 140 feeder types (8 mm equivalent) and up to 96 on the multifunction machine |
| Placement accuracy | Accuracy must hold across the board, not only at the machine origin | ±0.035 mm, or ±0.025 mm with Cpk of 1.0 or better, calibrated on site |
| Print quality input | Placement cannot fix a defective paste deposit | S630 3D SPI verifies print quality after stencil printing, before placement |
| Tray-supplied components | Tape feeders cannot address tray-fed parts at all | 15-tray sATS15 JEDEC tray system on the multifunction machine |
| Dense board real estate | Smaller components and closer spacing reduce placement tolerance | 0201 to 55 x 100 mm placement range on the high-speed mounter |
| Ramp-up time | A line that is late to rated output delays the return on the investment | Commissioned and calibrated, then validated against uptime before handover |

Acceptance criteria, not specs: station sizing, component support (QFN, BGA, SOP, IC tray) for automotive and consumer assemblies, fast changeover and complete delivery decide how fast a line reaches 95,000 CPH.
YSM20R is the high-speed backbone — 95,000 CPH, ±0.035mm accuracy (±0.025mm at Cpk ≥ 1.0), components 0201 to 55 × 100mm — and a YSM10 multifunction machine covers parts that cannot be fed at rate.


| Date | Item | Model | Qty |
|---|---|---|---|
| 2022-12-01 | Yamaha YSM20 high-speed mounter | YSM20 | 1 |
| 2022-12-01 | Yamaha YSM10 modular mounter | YSM10 | 1 |
| 2022-12-01 | JHIMS S630 3D SPI solder paste inspection | S630 | 1 |
| 2022-12-01 | Yamaha tape feeder | 8mm | 60 |
| 2023-11-01 | Yamaha YSM20R high-speed mounter | YSM20R | 2 |
| 2023-11-01 | Yamaha YSM10 modular mounter | YSM10 | 2 |
Delivered across two purchase orders: the 2022 order built the customer’s first automated line (YSM20 + YSM10 with S630 3D SPI and 60 feeders), and the 2023 order added two high-speed lines built around YSM20R + YSM10.
| Feature | YSM20R | YSM10 |
|---|---|---|
| Placement Speed | Up to 95,000 CPH | Up to 46,000 CPH (HM head, optimal) |
| Placement Accuracy | ±0.035mm (±0.025mm, Cpk ≥ 1.0) | ±0.035mm (±0.025mm, Cpk ≥ 1.0) |
| Component Range | 0201 to 55 × 100mm | 0201 / 03015 metric to 12 × 12mm (opt. 55 × 100mm) |
| PCB Size | L50×W50 to L810×W490mm | L50×W50 to L510×W460mm (opt. L610mm) |
| Feeder Capacity | Up to 140 types (8mm equivalent) | Up to 96 types (8mm equivalent) |
| Tray Capacity | Up to 30 layers (sATS30NS) | 15 trays (sATS15, JEDEC) |
| Power Supply | 1.9kW (typical) | 3-phase AC 200~416V ±10%, 50/60Hz |

The implementation followed a four-week ramp-up plan for each delivery, coordinated by the JHIMS engineering team:
The four-week ramp-up is a commissioning sequence with one defined output per week.
The four-week ramp-up used on each delivery, and the acceptance point attached to each stage.
| Stage | Activity | Acceptance point |
|---|---|---|
| Week 1 | Site assessment and equipment delivery | Power, air, floor position and board flow confirmed before machines are placed |
| Week 2 | Mechanical installation of the placement machines | Machines levelled and connected to the existing conveyor and line services |
| Week 2-3 | Calibration of the mounting heads | Placement accuracy brought to ±0.035 mm at the installation |
| Week 3 | Feeder, nozzle and tray configuration | Component range of the product mix loaded and verified |
| Week 4 | Trial production and validation | Line run as a system: feeders, conveyor handshake, programs and inspection |
| Week 4 | Uptime confirmation before handover | 99% uptime confirmed before the line is released to production |
| On handover | Operator training | Operators able to run products and recall programs without support |
| After handover | After-sales support | Remote troubleshooting, video guides and on-site service available |



Watch the Yamaha YSM20R and YSM10 machines at the Changsha customer site. Watch the full video on YouTube.
Watch how the two machine roles work side by side.
99.5% yield on the YSM20R-based lines, with 40% faster cycles and a 25% defect reduction, supporting more than 150,000 monthly units and ROI in about 18 months.
| Metric | Reported Result |
|---|---|
| Cycle Time | 40% faster |
| Yield | 99.5% |
| Defect Rate | 25% reduction |
| Monthly Output | 150,000+ units |
| ROI Payback | ~18 months |
Less rework and scrap compound the 40% faster cycle: 99.5% yield with a 25% defect reduction lifts capacity past 150,000 units a month and pays back in about 18 months. The 2023 repeat order is the verdict.
The repeat purchase reflects the trust built through delivery reliability, installation quality and after-sales responsiveness.
Output is set by the slowest station, so a high-speed mounter (twin HM heads, 95,000 CPH, 140 feeder types at 8 mm) pairs with a multifunction machine (up to 46,000 CPH, to 12 × 12 mm, 15-tray sATS15 JEDEC, QFN/BGA/SOP).
Separating the two roles also pays off in day-to-day operation.
Contact our engineers for a free line audit and custom configuration — we reply within 12 working hours (Mon–Sat, 09:00–23:00 China Standard Time, UTC+8).