Address
Building A1, Runteng Industrial Park, No. 4 Xishan Road, Longteng Community, Shiyan Subdistrict, Bao'an District, Shenzhen 518000, China
Work Hours
Monday to Saturday: 09:00 – 23:00 (UTC+8)
Sunday: closed
Address
Building A1, Runteng Industrial Park, No. 4 Xishan Road, Longteng Community, Shiyan Subdistrict, Bao'an District, Shenzhen 518000, China
Work Hours
Monday to Saturday: 09:00 – 23:00 (UTC+8)
Sunday: closed

Video tutorial for the JHIMS LMFD LB label feeder on FUJI NXT modules — installation and threading, feed pitch, the fault diagnosis table, maintenance cycles and the field rules that keep labels feeding at ±0.1 mm.

See how a German electronics enterprise built a fully automated SMT line in Malaysia with JHIMS — 100% turnkey DDP delivery, Yamaha placement, and audit-re.

How an Indian OEM electronics maker removed a production bottleneck with a JHIMS L5 solder paste printer: ±0.025 mm print accuracy and a sub-7-second cycle.

Four used Yamaha YSM20R machines went to a Spanish LED display maker in two orders: CPK-verified accuracy and two years of zero breakdowns.

A Spanish LED display manufacturer added a third used Yamaha YSM20R from JHIMS to lift placement capacity: CPK-verified accuracy, 30% efficiency gain, ready on the first shift.

Russian LED panel light bar maker added a JHIMS DPS-2 lens feeder to its Hanwha SM481 line: throughput +35%, downtime -25%.

Saudi LED display maker automated M0.6–M2.0 mm screw assembly with a JHIMS 2P-LXS500 six-axis machine: 0.9 s per screw, 5,000 screws/hour, assembly time down 50%+.

Xiamen TV backlight maker cut its lens-feeding bottleneck with a JHIMS DPS-2 feeder on Hanwha lines: throughput +67% (6,000 to 10,000 CPH), jams -87%, 99% lens alignment.

Shenzhen LED display maker swapped four Hanwha S2 mounters for two Yamaha YSM40R: placement +123% (65,000 to 145,000 CPH), line 33% shorter, irregular LED defects eliminated.

Dongguan LED strip line automated on a legacy Hanwha SM481: cycle time -40% (6 min per strip), glue waste 30% to 5%, uptime 85% to 99%, payback in 4 to 6 months.